Planning & Regulations
Envelope control, setbacks, height limits and the submission sequence, in plain language.
In this guide
32 min · 5 articles

/10 min
Planning Permission, Step by Step
A landed project goes to URA for planning permission first, then to BCA for building plan and structural approval, then through to TOP and CSC at completion. On a straightforward detached rebuild, written permission typically takes six to twelve weeks. Queries reset that clock, which is why the drawings matter more than the covering letter.

/4 min
Setbacks and Envelope Control, Explained
Landed housing in Singapore is controlled by an envelope rather than a plot ratio, so the maximum shape of a house is fixed by its plot before any design begins. Outside Good Class Bungalow Areas, the main building is set back 2 metres from side and rear boundaries; from the road it is 7.5 metres on most residential roads, 12 on a Category 2 road and 24 on a Category 1. Height is 12 metres in a two-storey area and 15.5 in a three-storey one.

/4 min
Conservation Properties: What Changes
On a conserved property URA's principle is the 3R — maximum Retention, sensitive Restoration and careful Repair — so the original structure and architecture are kept, and new work goes where the rules for that area allow it: in a residential historic district such as Emerald Hill or Blair Plain, a rear extension lower than the main roof; in a secondary settlement such as Joo Chiat, a rear extension up to the area's height. Approvals take longer and the palette is narrower, and the design problem is more interesting rather than less.

/7 min
BCA Requirements and Building Plan Approval
After URA planning permission, a landed project moves into building control with BCA: building plan and structural plan approval, then a permit to commence before any work on site, inspections during construction, and TOP and CSC at the end. Planning decides what the house may be; building control decides whether it can safely be built.

/7 min
Common Approval Mistakes, and How to Avoid Them
Most approval problems are self-inflicted and discovered late. The recurring ones are designing before the envelope is confirmed, treating a neighbour's house as a precedent, inheriting unauthorised works, working from inaccurate drawings, missing site constraints, changing the design after approval, and building a programme that assumes first-time approval.